Gunderson High School Retro-Commissioning

 

SJUSD engaged TBI Energy to reduce energy waste at one of its oldest campuses. Gunderson High School, built in 1976, uses approximately twice the energy/student of the average district school despite having a 600KW solar system on site.

TBI Energy is taking advantage of a favorable utility rebate environment to help finance the replacement of a number aging and inefficient mechanical systems while upgrading the campus infrastructure.




Phase 1:    IMPLEMENTED
  1. Add 2 flow meters (equipment & install) and re-program VFD’s to achieve design flow rate and program as well as lower flow rate for night-time setback.
  2. Remove and replace 2 existing, primary pool boilers with 97% efficient condensing boilers
  3. Project Cost after $55,000 rebate = $70,000
  4. Annual Energy Savings = $52,000
Phase 2:    IN FINAL DESIGN
  1. Reconfigure Domestic hot water system and add solar assist
  2. Optimize operation of HVAC hot water loop to reduce wasted energy
  3. Begin replacement of main boilers with low NOx units
  4. Eliminate secondary heat transfer loop to pool
  5. Total project cost after $90,000 rebate = $60,000
  6. Annual Energy savings $25,000

 

 